I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
BRUSH announce
UK: BRUSH Power Networks has announced the acquisition of KUS Power Engineering, a business that provides design, build and resource solutions for substations.
The mov...
China, Sichuan: China is building an ultra-high voltage substation at the highest altitude in the country so far.
The construction of a 1,000 kV substation in Ganzi Tibetan Autonomous Prefecture of...