Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
Last week, Trihope sucessed delivery the 4 units 1400 Four layer foil winding machine to our America customer, The customer conducted a pre factory inspection at our factory, They Highly affirm t...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...
According to a new report by Vantage Market Research, the global smart transformers market, valued at $2.19 B in 2021 is projected to reach $4.55 B by 2028.
The smart transformers industry is expe...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...