The coil of transformer is an important part of transformer. It is said that the heart of coil type transformer is very important to transformer. In the transformer, the coil is the part of the cir...
The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
Last week, Trihope sucessed delivery the 4 units 1400 Four layer foil winding machine to our America customer, The customer conducted a pre factory inspection at our factory, They Highly affirm t...
Despite of the strike of COVID-19 pandemic during Feb in China, Our company is actively resuming to normal work. Engineers from our SENERGE factory have flew to TBEA headquarter in Xinjiang China i...
Q1) what are instrument transformer?
If we want to measure extremely high values of current and voltage than there are two ways of measuring it. One is to use high capacity instruments which would ...