China, Beijing: China started with the construction of an UHV DC transmission line.
China started with the construction of an ultra-high voltage (UHV) direct current (DC) transmission line that wi...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
Transformer oil in the state of water, the transformer in the transportation, storage, use process may be entered by the outside or oil itself oxidation of water, the water generated will exist in...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
Transformer coil production is a very professional process, and the equipment and tooling used are most special. And according to the different coil structure, the equipment and tooling used are al...