Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
Total eight sets of machines and equipment from Mexican customers have been delivered for use one after another. Thank all partners for your strong support! Work together for Chinese equipment goin...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
The thermal stability of the insulation material is the main factor affecting the life and overload capacity of the oil-immersed transformer. By explaining the preparation process, physical and che...
Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...