Last week, Trihope sucessed delivery the 4 units 1400 Four layer foil winding machine to our America customer, The customer conducted a pre factory inspection at our factory, They Highly affirm t...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...
The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...