Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
The thermal stability of the insulation material is the main factor affecting the life and overload capacity of the oil-immersed transformer. By explaining the preparation process, physical and che...
Trihope has successfully install and commissioned two paper-wrapped insulated wire auto wrapping machines in one of the largest cable factories in Mexico.
Paper wrapped round & rectangular wire...
At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
In Aug 2023, TRIHOPE successfully commissioned multi-function busbar machining center to WEG group Mexico factory. WEG is a well-known transformer manufacturer in BRAZIL, have marketing leadershi...