In transformers, in addition to the primary and secondary coils, there are several other important components and accessories. The insulating material is one of the most critical components of a tr...
Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
BRUSH announce
UK: BRUSH Power Networks has announced the acquisition of KUS Power Engineering, a business that provides design, build and resource solutions for substations.
The mov...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
Trihope has successfully install and commissioned two paper-wrapped insulated wire auto wrapping machines in one of the largest cable factories in Mexico.
Paper wrapped round & rectangular wire...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...