The welding machine is composed of three parts: feeding roller, main machine, discharge roller. The main transformer welding machine includes the base, two sets of symmetrical width adjustable slider, transfer device, positioning device, welding device, two sets of MIG welding machines, compressed air system, and electric control system.
The machine is easy to be operated, the operator adjusts the slider according to corrugated fin width before operated and inputs the parameters into the touch screen, such as welding corrugated fin (height, corrugation pitch distance) and welding speed, welding form, etc. The operator put the corrugated fin into the main machine from the feeding roller by manual, the sensor set up at the entrance of the main equipment starts to operate automatically after receiving the signal
Slider adjustable width |
280~1320mm |
Main equipment work platform height |
900mm |
Welding gun lift stroke |
430mm |
Welding speed |
0.5~1m/min |
We are 5A Class Transformer Home with a full solution for Transformer Industry
A1, We are a real manufacturer with complete in-house facilities
A2, We have a professional R&D Center, having collaboration with well-know Shandong University
A3, We have Top Performance Certificated with International Standards likes ISO, CE, SGS, BV
A4, We are better cost-efficient and convenient supplier equipped with international brand components like Simens, Schneider, etc
A5, We are a reliable business partner, served for ABB, TBEA, PEL, ALFANAR, etc in the past 17 years
Q1: How long is the warrantly of Transformer Oil Tank Welding Machine ?
A: The guarantee period shall be 12 months counting from the date of signing the Acceptance Report of this machine at the end-user’s site,but no longer than 14 months from the date of delivery.
Q2: Can you provide the turn-key service of supplying complete machinery and equipment for a new transformer factory ?
A: Yes, we have rich experience for establish a new transformer factory. And had successfully helped Pakistan and Bangladesh customers to build a transformer factory.
Q3: Can u provide the After-sales installation and commissioning service in our site?
Yes, we have the professional team for after-sales service. We will provide installation manual and video when machine delivery, If you need, we can also delegated engineers to visit your site for installation and commission. We promise we will provide 24 hours of online feedback when you need any help.