With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...
Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...
CGTN
Baihetan Hydropower Station straddling the southwest China’s provinces of Yunnan and Sichuan, is located on the Jinsha River. /CFP
China has put into full operation a major power ...
China, Sichuan: China is building an ultra-high voltage substation at the highest altitude in the country so far.
The construction of a 1,000 kV substation in Ganzi Tibetan Autonomous Prefecture of...
At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...