Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
The commonly used transformer core cutting equipment includes the slitting line and the core cutting line
The slitting line is mainly used for the split of silicon steel sheet in transformer, motor...
The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
Despite of the strike of COVID-19 pandemic during Feb in China, Our company is actively resuming to normal work. Engineers from our SENERGE factory have flew to TBEA headquarter in Xinjiang China i...
At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...