Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
In Aug 2023, TRIHOPE successfully commissioned multi-function busbar machining center to WEG group Mexico factory. WEG is a well-known transformer manufacturer in BRAZIL, have marketing leadershi...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...