Function Instructions of Vacuum Epoxy Resin Casting equipment
1.Automatic vacuum casting equipment adopts currently the most advanced dynamic mixing technology, equipment function description is as follows:
2.Automatic batching:After the degassing of A and B material,automatic batching by mixing proportion according to the set,ensure that the reduction of labor intensity and civilized production;ensure that the ingredients error is less than + / – 0.3 kg.
3.Automatic degassing:Thin film degassing,Vacuum degree can be set,automatic control,
Avoid long time high vacuum evaporation effective components.
4.Using dynamic blender: mixing uniformity, high efficiency, no pollution, convenient cleaning.
5.High degree of automation, convenient operation, equipped with advanced man-machine interface.Process monitoring and recording.
Equipment composition for Vacuum Epoxy Resin Casting
300L Resin mixing degassing tank system | 1 set |
300L Curing agent mixing degassing tank system | 1 set |
Electronic scale metering conveying system | 2 set |
300L Final mixing tank system | 1 set |
Vacuum casting tank system | 1 set |
Heating system | 4 sets |
Vacuum system | 2 sets |
Cooling water system | 1 set |
Pneumatic system | 1 set |
Control system | 1 set |
Equipment steel platform | 1 set |
Technical parameter for Vacuum Casting Process:
Pouring tank size | Φ2800×3500mm |
Pumping speed of the main pump of vacuum system | 600L∕S |
Working temperature of the pouring pot | 70~85℃ |
Limiting vacuum degree of pouring tank (cold, empty) | ≤20Pa |
Leakage rate of pouring tank | ≤50Pa.L∕S |
Working vacuum degree of pouring tank | 100~300Pa |
Working pressure of pouring tank | Atmospheric pressure ~0.6MPa |
We are 5A Class Transformer Home with a full solution for Transformer Industry
1, A real manufacturer with complete in-house facilities
2, A professional R&D Center, having collaboration with well-know Shandong University
3, A top performance company certificated with International Standards like ISO, CE, SGS and BV etc
4, A better cost-efficient supplier , all key components are international brands like Simens, Schneider and Mitsubishi etc.
5, A reliable business partner, served for ABB, TBEA, PEL, ALFANAR, ZETRAK etc
Q1: How long is the warranty time?
A: Our warranty period is 12 months from the commissioning or 14 months from the date of shipment. Which is due first. Anyhow, our service will up to the full lifetime of the equipment. We commit to respond to your feedback within 24 hours.
Q2: Can you provide the turn-key service of supplying complete machinery and equipment for a new transformer factory ?
A: Yes, we have rich experience for establish a new transformer factory. And had successfully helped Pakistan and Bangladesh customers to build a transformer factory.
Q3: Can u provide the After-sales installation and commissioning service in our site?
Yes, we have the professional team for after-sales service. We will provide installation manual and video when machine delivery, If you need, we can also delegated engineers to visit your site for installation and commission. We promise we will provide 24 hours of online feedback when you need any help.