In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...
In transformers, in addition to the primary and secondary coils, there are several other important components and accessories. The insulating material is one of the most critical components of a tr...
Despite of the strike of COVID-19 pandemic during Feb in China, Our company is actively resuming to normal work. Engineers from our SENERGE factory have flew to TBEA headquarter in Xinjiang China i...
China, Beijing: China started with the construction of an UHV DC transmission line.
China started with the construction of an ultra-high voltage (UHV) direct current (DC) transmission line that wi...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...