Short Description:


Product Detail

Related Video

Feedback (2)

, , ,
New Arrival China Short Circuit Test Of Transformer - Partial discharge dector – Trihope Detail:

The PD test is the main test items for electric equipments insulation, and the partial discharge is the important parameter of electric equipments quality. The detector is based on modularization, designing the simulation parts as standard module according to different function. The modules can be added or deleted as per users requirement. The module is standard Europe type, which is convenient for maintenance and update. It adopts advanced hardware process system, and NI card from America National Instrument. It also adopts digital filtering and other signal process device to collect and analyze the PD signal.

• Test Frequency range:  50/60Hz(30Hz ~ 1kHz optional)
• Power supply:  220V/50Hz 
• Test sensibility:  <0.02pC(load capacitor 50pF)
• Minimum measuring apparent charge:  <0.1pC;
• Sampling depth of each channel:  32M
• Resolution:  8bit±1/2LSB;
• Max sampling rate:  50MHz(can upto 100MHz)
• Linearity:  <+/-1%;
• Pulse resolution time:  <10uS Max input pulse voltage 100V
• Synchronization mode:  Inner trigger/outer trigger/manual
• Adjustable input attenuation:  0 ~ 96dB,band 4dB
• Time window:  0 ~ 3600, more time windows can be set
• Frequency bandwidth:  5kHz ~ 450kHz;

Product detail pictures:

New Arrival China Short Circuit Test Of Transformer -
 Partial discharge dector – Trihope detail pictures


Related Product Guide:

New Arrival China Short Circuit Test Of Transformer - Partial discharge dector – Trihope , The product will supply to all over the world, such as: , , ,

  • 5 Stars By from -

    5 Stars By from -
    Write your message here and send it to us