Trihope has successfully install and commissioned two paper-wrapped insulated wire auto wrapping machines in one of the largest cable factories in Mexico.
Paper wrapped round & rectangular wire...
China, Sichuan: China is building an ultra-high voltage substation at the highest altitude in the country so far.
The construction of a 1,000 kV substation in Ganzi Tibetan Autonomous Prefecture of...
1、 Composition of power system
(1) Power system
According to the specified technical and economic requirements
A unified system is called power system. The power system also includes relays to e...
BRUSH announce
UK: BRUSH Power Networks has announced the acquisition of KUS Power Engineering, a business that provides design, build and resource solutions for substations.
The mov...
Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...