BRUSH announce
UK: BRUSH Power Networks has announced the acquisition of KUS Power Engineering, a business that provides design, build and resource solutions for substations.
The mov...
At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...
China, Sichuan: China is building an ultra-high voltage substation at the highest altitude in the country so far.
The construction of a 1,000 kV substation in Ganzi Tibetan Autonomous Prefecture of...
Last week, Trihope sucessed delivery the 4 units 1400 Four layer foil winding machine to our America customer, The customer conducted a pre factory inspection at our factory, They Highly affirm t...
Q1) what are instrument transformer?
If we want to measure extremely high values of current and voltage than there are two ways of measuring it. One is to use high capacity instruments which would ...
effect of temperature on high pressure test
The change of temperature will fully affect the insulation resistance, so when the external temperature continues to rise, the movement of molecules and ...