The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
Transformer oil in the state of water, the transformer in the transportation, storage, use process may be entered by the outside or oil itself oxidation of water, the water generated will exist in...
China, Beijing: China started with the construction of an UHV DC transmission line.
China started with the construction of an ultra-high voltage (UHV) direct current (DC) transmission line that wi...
When the transformer is in operation, heat is generated due to copper losses in the windings and iron losses in the core. The removal of heat from the transformer is known as cooling of the transfo...