Total eight sets of machines and equipment from Mexican customers have been delivered for use one after another. Thank all partners for your strong support! Work together for Chinese equipment goin...
In transformers, in addition to the primary and secondary coils, there are several other important components and accessories. The insulating material is one of the most critical components of a tr...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
A series of problems, such as larger diameter, the formation of waves on the cylinder, the deviation of the verticality of the assembly, and the unqualified performance after annealing during proce...
Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
effect of temperature on high pressure test
The change of temperature will fully affect the insulation resistance, so when the external temperature continues to rise, the movement of molecules and ...