Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...
CGTN
Baihetan Hydropower Station straddling the southwest China’s provinces of Yunnan and Sichuan, is located on the Jinsha River. /CFP
China has put into full operation a major power ...
The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
Total eight sets of machines and equipment from Mexican customers have been delivered for use one after another. Thank all partners for your strong support! Work together for Chinese equipment goin...
When the transformer is in operation, heat is generated due to copper losses in the windings and iron losses in the core. The removal of heat from the transformer is known as cooling of the transfo...
China, Beijing: China started with the construction of an UHV DC transmission line.
China started with the construction of an ultra-high voltage (UHV) direct current (DC) transmission line that wi...