BRUSH announce
UK: BRUSH Power Networks has announced the acquisition of KUS Power Engineering, a business that provides design, build and resource solutions for substations.
The mov...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...
Transformer oil in the state of water, the transformer in the transportation, storage, use process may be entered by the outside or oil itself oxidation of water, the water generated will exist in...
A series of problems, such as larger diameter, the formation of waves on the cylinder, the deviation of the verticality of the assembly, and the unqualified performance after annealing during proce...
When the transformer is in operation, heat is generated due to copper losses in the windings and iron losses in the core. The removal of heat from the transformer is known as cooling of the transfo...