Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
In Aug 2023, TRIHOPE successfully commissioned multi-function busbar machining center to WEG group Mexico factory. WEG is a well-known transformer manufacturer in BRAZIL, have marketing leadershi...
effect of temperature on high pressure test
The change of temperature will fully affect the insulation resistance, so when the external temperature continues to rise, the movement of molecules and ...
Q1) what are instrument transformer?
If we want to measure extremely high values of current and voltage than there are two ways of measuring it. One is to use high capacity instruments which would ...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
Congratulations: Successfully Installed and Commissioned the Vacuum Drying & Oil Filling Equipment in KSA.
The pandemic of Corona Virus has not stopped us from moving forward, Trihope te...