Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...
The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
The commonly used transformer core cutting equipment includes the slitting line and the core cutting line
The slitting line is mainly used for the split of silicon steel sheet in transformer, motor...
Transformer winding machine is the most important core production equipment in the production process of transformer. Its winding performance determines the electrical characteristics of transforme...
The thermal stability of the insulation material is the main factor affecting the life and overload capacity of the oil-immersed transformer. By explaining the preparation process, physical and che...
Transformer coil production is a very professional process, and the equipment and tooling used are most special. And according to the different coil structure, the equipment and tooling used are al...