At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
China, Beijing: China started with the construction of an UHV DC transmission line.
China started with the construction of an ultra-high voltage (UHV) direct current (DC) transmission line that wi...
Total eight sets of machines and equipment from Mexican customers have been delivered for use one after another. Thank all partners for your strong support! Work together for Chinese equipment goin...
The First APG unit for CT PT installed in Pakistan Biggest Transformer Factory
Epoxy resin CT PT APG injection machine– the most common reactive molding process used for high-volume product...
In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...