Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to ...
In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...
The thermal stability of the insulation material is the main factor affecting the life and overload capacity of the oil-immersed transformer. By explaining the preparation process, physical and che...
In Aug 2023, TRIHOPE successfully commissioned multi-function busbar machining center to WEG group Mexico factory. WEG is a well-known transformer manufacturer in BRAZIL, have marketing leadershi...
With over 19% of the global market share, M/s COFICAB has become a reliable partner for the top automotive wiring harness makers and most of the OEMs. In Aug 2023, M/s Coficab share us the ...
China, Sichuan: China is building an ultra-high voltage substation at the highest altitude in the country so far.
The construction of a 1,000 kV substation in Ganzi Tibetan Autonomous Prefecture of...