Last week, Trihope sucessed delivery the 4 units 1400 Four layer foil winding machine to our America customer, The customer conducted a pre factory inspection at our factory, They Highly affirm t...
Despite of the strike of COVID-19 pandemic during Feb in China, Our company is actively resuming to normal work. Engineers from our SENERGE factory have flew to TBEA headquarter in Xinjiang China i...
At the moment of the epidemic, our steps are not stopped. In the severe epidemic situation that has lasted for nearly half a year in the East China Plain, especially in the case of the suspension o...
A series of problems, such as larger diameter, the formation of waves on the cylinder, the deviation of the verticality of the assembly, and the unqualified performance after annealing during proce...
When the transformer is in operation, heat is generated due to copper losses in the windings and iron losses in the core. The removal of heat from the transformer is known as cooling of the transfo...