Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
Trihope has successfully install and commissioned two paper-wrapped insulated wire auto wrapping machines in one of the largest cable factories in Mexico.
Paper wrapped round & rectangular wire...
China, Sichuan: China is building an ultra-high voltage substation at the highest altitude in the country so far.
The construction of a 1,000 kV substation in Ganzi Tibetan Autonomous Prefecture of...
The coil of transformer is an important part of transformer. It is said that the heart of coil type transformer is very important to transformer. In the transformer, the coil is the part of the cir...
When the transformer is in operation, heat is generated due to copper losses in the windings and iron losses in the core. The removal of heat from the transformer is known as cooling of the transfo...