Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
The thermal stability of the insulation material is the main factor affecting the life and overload capacity of the oil-immersed transformer. By explaining the preparation process, physical and che...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
BRUSH announce
UK: BRUSH Power Networks has announced the acquisition of KUS Power Engineering, a business that provides design, build and resource solutions for substations.
The mov...
Transformer coil production is a very professional process, and the equipment and tooling used are most special. And according to the different coil structure, the equipment and tooling used are al...