In the working process of transformer, a lot of heat will be produced, which seriously affects the performance of transformer. During the operation of transformer, the loss of winding and core wil...
With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment.
In order to reduce the r...
I.Cause of Partial Discharge
The transformer insulator, metal body and so on are often with some sharp angle and burr, so the electric charges under the action of electric field intensity will conc...
Trihope signed an export contract with customer from KSA in July 2021, and already made delivery in October and November 2021, including two Vacuum Drying and Oil Filling Systems Model KY-6000 and ...
The coil of transformer is an important part of transformer. It is said that the heart of coil type transformer is very important to transformer. In the transformer, the coil is the part of the cir...
Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant.
The Contract including 3000kVA(50/60Hz)and 500kVA(200Hz) MG Set Fro...