• How to use transformer coil winding machine correctly?

    How to use transformer coil winding machine correctly?

    Transformer winding machine is the most important core production equipment in the production process of transformer. Its winding performance determines the electrical characteristics of transformer and whether the coil is beautiful. At present, there are three types of winding machine for transf...
    Read more
  • Influence of insulating materials on oil-immersed transformers

    Influence of insulating materials on oil-immersed transformers

    The thermal stability of the insulation material is the main factor affecting the life and overload capacity of the oil-immersed transformer. By explaining the preparation process, physical and chemical properties, electrical performance and anti-aging ability of high-temperature insulation mater...
    Read more
  • Analysis on high voltage test of power transformer

    effect of temperature on high pressure test The change of temperature will fully affect the insulation resistance, so when the external temperature continues to rise, the movement of molecules and ions in the insulation material will continue to accelerate the speed of movement with the increase ...
    Read more
  • Remote installation 1200KV Impulse voltage generator set under the epidemic situation

    Remote installation 1200KV Impulse voltage generator set under the epidemic situation

    Last Monday, PEL and Trihope sign on the installation satisfaction for 1200KV, 180KJ High voltage impulse generator system. This is a new stage for M/S PEL. Because it means she has the ability to produce and test a 220KV power transformer.   The utility model relates to a power supply devic...
    Read more
  • SENERGE help TBEA strengthen industrial automation

    SENERGE help TBEA strengthen industrial automation

    Despite of the strike of COVID-19 pandemic during Feb in China, Our company is actively resuming to normal work. Engineers from our SENERGE factory have flew to TBEA headquarter in Xinjiang China immediately in Mar, 2020 for installation and commission of our automatic c...
    Read more
  • Pass the difficult time , We are together

    Pass the difficult time , We are together

    With the global epidemic still severe, our engineers and Pakistan Engineers are still working on the installation and commissioning of vpd-300 Vapor phase drying equipment. In order to reduce the rish of infection, our engineers moved to the factory from the end of last month, Thanks for their h...
    Read more
  • Congraulation :  Trihope wins 10 million contract from Pakistan

    Congraulation : Trihope wins 10 million contract from Pakistan

    Trihope signs an export contract with PAK ELEKRTONIC LIMITED , Pakistan For build 220KV Power Transformer Manufacturing plant. The Contract including  3000kVA(50/60Hz)and 500kVA(200Hz) MG Set From SEC; 1200KV impulse Generator tests system from  BHT;   VPD -300 vapor phase drying equipment Fro...
    Read more